Biogas power
Advanced schedule control
Biogas power plant with remote control
Advanced schedule controls optimizes revenue generation
Solutions
Biogas Power
This 380kW bio­gas plant in Switz­er­land opt­ed for an ad­vanced nat­con7 per­for­mance mon­i­tor­ing and re­port­ing sys­tem. The scope of sup­p­ly in­cludes:

Con­sul­tan­cy
En­gi­neer­ing De­sign
Da­ta ac­qui­si­tion hard­ware and ex­tend­ed RTUs
Ba­sic re­mote set­point con­trol func­tio­n­al­i­ty
Da­ta Ser­vices, Re­port­ing Ser­vice
In­ter­net con­nec­tion via on-board mo­dem
Us­er in­ter­faces
Com­mis­sion­ing and Train­ing
As-built documentation >>